NENA NG9-1-1 Go-To Handbook: Difference between revisions

→‎Statement of Documentation: Update to match changes in source docx from comments received in review.
(Update to match changes in source docx from comments received in review. Mostly typos.)
(→‎Statement of Documentation: Update to match changes in source docx from comments received in review.)
Line 170:
[https://wiki.en.it-processmaps.com/index.php/Service_Asset_and_Configuration_Management ITIL Service Asset and Configuration Management]<ref>[https://wiki.en.it-processmaps.com/index.php/History_of_ITIL IT Infrastructure Library (ITIL)]. ITIL is a collection of best practices on a variety of IT project related topics. It includes recommendations about maintaining project documentation under its Service Asset and Configuration Management section.</ref>: The sections dealing with Configuration Identification, Configuration Control, and Configuration Verification and Audit.
 
[https://www.nena.org/page/NG911_PSAP_REQ NENA/APCO Next Generation 9-1-1 Public Safety Answering Point Requirements (NENA/APCO-REQ-001)]<ref>[https://www.nena.org/?NG911_PSAP_REQ NENA/APCO Next Generation 9-1-1 Public Safety Answering Point Requirements (NENA/APCO-REQ-001)]. This technical document introduces requirements for a NG9-1-1 Public Safety Answering Point (PSAP) that can receive IP-based signaling and media for delivery of emergency calls conformant to the latest version of the NENA i3 Architecture document.</ref>: Annotate the project library documentation to note which specific requirements from (NENA/APCO-REQ-001) are considered mandatory for the scope of the specific NG9-1-1 project identified.
 
== Estimated Scope and Project Timelines ==