3,018
edits
MikeVislocky (talk | contribs) (→Example Communication Plan: Update to match changes in source docx from comments received in review.) |
MikeVislocky (talk | contribs) (→Functional Requirements: Update to match changes in source docx from comments received in review.) |
||
Line 234:
[http://www.nena.org/resource/resmgr/ng9-1-1_project/2011_9-1-1_tutorial_v4.1.pptx NENA NG9-1-1 Tutorial]<ref name=":0" />: Slide 23
[https://www.nena.org/page/NG911_Policy_Rules Overview of Policy Rules for Call Routing and Handling in NG9-1-1 (NENA-INF-011) (Under update- originally NENA 71-502
[https://rosap.ntl.bts.gov/view/dot/4013 Next Generation 9-1-1 (NG9-1-1) System Initiative: Final System Design Document] <ref>[https://rosap.ntl.bts.gov/view/dot/4013 USDoT 911 Initiative System Description & Requirements Document]. The NG9-1-1 Final System Design document is the culmination of the technical work of the NG9-1-1 Initiative. Starting with the NG9-1-1 Concept of Operations (CONOPS), the project team leveraged past work done in the public safety and standards communities. After the CONOPS, the project developed both high-level and detailed requirements, an architecture analysis report, and the initial system design. These project artifacts served as the basis for the Proof of Concept (POC) Deployment Plan</ref>: Entire document
|