NENA NG9-1-1 Go-To Handbook: Difference between revisions

Content added Content deleted
(NENA Next Generation 9-1-1 Data Management Requirements - (NENA-REQ-002))
(→‎Financial Forecasting: Added bullets)
Line 214: Line 214:
[https://www.911.gov/project_911modellegislativeguidelines.html Model State 911 Plan - NHTSA]<ref>[https://www.911.gov/project_911modellegislativeguidelines.html Model State 911 Plan - NHTSA]. The Model State 9-1-1 Plan document is intended help states develop a better planning and coordination process for 9-1-1 communications. It addresses the following elements:
[https://www.911.gov/project_911modellegislativeguidelines.html Model State 911 Plan - NHTSA]<ref>[https://www.911.gov/project_911modellegislativeguidelines.html Model State 911 Plan - NHTSA]. The Model State 9-1-1 Plan document is intended help states develop a better planning and coordination process for 9-1-1 communications. It addresses the following elements:


Models for state coordination and collaboration;
*Models for state coordination and collaboration;


Approaches to oversight and management of the state’s 9-1-1 network;
*Approaches to oversight and management of the state’s 9-1-1 network;


Mechanism for establishing and monitoring progress in implementing the state's 9-1-1 system;
*Mechanism for establishing and monitoring progress in implementing the state's 9-1-1 system;


Mechanism for the allocation of state and federal funding, if available, to public safety answering points (PSAPs) for equipment and operations; and
*Mechanism for the allocation of state and federal funding, if available, to public safety answering points (PSAPs) for equipment and operations; and


Methods by which PSAPs will integrate with other emergency communication, telecommunications, and information networks.</ref>: Chapter 2.
*Methods by which PSAPs will integrate with other emergency communication, telecommunications, and information networks.</ref>: Chapter 2.


== Functional Requirements ==
== Functional Requirements ==