Wireless Phase I & II: Difference between revisions
Content added Content deleted
(Updated to match v19.) |
(Updated to match MG v24) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
'''''Wireless Phase I & II''''' refers to the delivery of a wireless 9-1-1 call with callback number and identification of the cell-tower from which the call originated. Call routing is usually determined by cell-sector. Required by FCC Report and Order 96-264 pursuant to Notice of Proposed Rulemaking (NPRM) 94-102.The delivery of a wireless 9-1-1 call with Phase I requirements plus location of the caller within 125 meters 67% of the time and Selective Routing based upon those coordinates. Subsequent FCC rulings have redefined the accuracy requirements. |
|||
{{External References}} |
|||
[https://www.fcc.gov/general/enhanced-9-1-1-wireless-services FCC: Enhanced 911 – Wireless Services] |
|||
[[Category:Glossary]] |
[[Category:Glossary]] |
Latest revision as of 21:47, 10 August 2021
Wireless Phase I & II refers to the delivery of a wireless 9-1-1 call with callback number and identification of the cell-tower from which the call originated. Call routing is usually determined by cell-sector. Required by FCC Report and Order 96-264 pursuant to Notice of Proposed Rulemaking (NPRM) 94-102.The delivery of a wireless 9-1-1 call with Phase I requirements plus location of the caller within 125 meters 67% of the time and Selective Routing based upon those coordinates. Subsequent FCC rulings have redefined the accuracy requirements.
External References